Earthing Pro MV

FAQS

When are the audio-visual alarms triggered?

Alarms indicate conditions such as grounding not verified, open circuit, or abnormal status to provide immediate on-site awareness. Exact behavior depends on the configured interlock logic.

How do I integrate it with pumps, valves, or an ESD system?

Use the permissive relay output to wire into the permissive/shutdown logic of pumps, valves, or ESD circuits, in accordance with the site’s control philosophy and interlock design.

What is the primary function of Earthing Pro GE?

It verifies grounding status and provides a permissive relay output for safety interlocking. This turns grounding confirmation into a verifiable control point before loading, filling, or transfer operations.

Is Earthing Pro GE suitable for hazardous (explosion-risk) areas?

Yes. It is designed for hazardous-area applications and is certified (ATEX / China Ex / CCC) within the scope defined by the certificates.

Chat With Us
WhatsApp Chat